Packaging of waste into the jumbo bags
Schedule Waste
Dry the jumbo bag with waste under sun
Schedule Waste
Load the jumbo bag with waste into the curtain sider
Schedule Waste
Load the schedule waste into the tipper truck
Schedule Waste
Suction of contaminated water into tanker
Schedule Waste
Unloading sand with tipper truck for waste blending method
Schedule Waste
Mix calcium carbonate powder with the schedule waste and sand
Schedule Waste
Test is run to ensure the waste is suitable for landfill
Schedule Waste
Packed jumbo bag is loaded on curtain sider and wrapped with stretch film
Schedule Waste
The sludge pond is scratched to clean the pond wall
Schedule Waste
Daily Safety Briefing
Schedule Waste
Safety gate on the trucks is locked
Schedule Waste